My Blog List

Sunday, October 9, 2022

Wiggly Wag

 Saturday Evening I received an email from Meagan with 3 Pictures attached for my approval. Meagan wanted to make sure they were 100% before making the second one. I am so impressed with Meagan's attention to the detail, it took my breath away. The pictures are attached.

Meagan's Wig Wag 

 


The original Wig Wag at the Hume Highway Level Crossing.

So now all I need is to wait for a parcel delivery, then I can make some changes to the scenery at the level crossing.

Cheers for now.

Wednesday, September 21, 2022

How far will one go.

My wife and I have now returned from a trip to Melbourne. We drove down for the AMRA Train Show at Caulfield Racecourse. (The round trip, 2955 klms). The show itself was quite enjoyable and layouts I had not seen before. The venue was quite large and not crowded. (The outside temperature was 9°C). The layouts that I liked the most, was "Monbulk Creek 1:480 scale, and Dauntsey Lock  1:350" scale, on both the rolling stock was laser made. I apologise for the video shaking. Unfortunately due to video size I can only upload one video.


Our main reason for the visit was to meet up with "The Train Girl" who is going to make some scenery items for me. These items will be the Wig Wag signals and Railway Crossing signs for the Hume Highway Level Crossing at Narellan, and some shunters for Campbelltown. These may take a while as Meagan is making the Wig Wag signals complete and assembled, so I will just have to be patient until they arrive.

Until then, cheers for now.

Saturday, July 23, 2022

What a Day.

 Last Saturday 16th was my running day with members from the train group. It was quite a successful day with 9 members in attendance. Some got involved in the train operation. 

I am waiting for some uploads of videos taken, so I can add them to this blog.

The thing that brought most attention was the Garratt. As you can see in the 4th picture of my previous blog, the Garratt is standing in Loco outside the shed and clear of the fuel line for the Diesel Fuel storage tank. I decided to drive it to Narellan and bring back a coal train, at this time the loco tender was sitting under the overhead pipe line and when I applied power it just sat there and the sound just kept repeating "lamps, lamps, lamps". I turned the power off and reapplied it and I had no functions, but the loco ran. So I ran it in "silent mode". The sound eventually returned and all was normal. Sunday I decided to go out and rearrange the trains back to their starting positions ready for another session, "when ever that may be". When I put the Garratt back on the Loco Road, I again lost the sound. I thought it was loss of voltage in the track, but it checked out ok. The sound returned after I moved the loco away from the shed, but it started to return from "no volume" and increase to the "set volume". Conclusion, the overhead filler pipe for the diesel tank on the tower affected the sound decoder in the Tender of the Garratt. The pipe is constructed from Piano wire and is free from any power sources, so why does it do it ?? and it's only with the Garratt !!

Yesterday I had a play with a members 30 Class and gave it a touch up with some weathering power over the boiler. I was so impressed with the way it took the "new shine" off the paint that I decided to do mine, and I did mine all over. It's not over done, but it looks the part. I'm very impressed with it.

Garratt with factory weathering.

Garratt with Powder Coating

30 Class with powder coating to remove the gloss finish

Nothing else has happened on the layout, just added some "Give Way" signs to a couple of intersections, and a few more trees and bushes, but that's all.

Cheers for now.


Thursday, June 30, 2022

Progress to the end.

This week I have managed to place all the Grass Tuffs to the layout. My next project is to install telegraph poles and wires, and some street signs around Camden.
Below are a few pictures of the Grass Tuffs.




Ignore those 2 locos at the bottom of the picture. 
No where else to put them


I will now prepare for my Running Day in a few weeks time.
Cheers.

Thursday, June 23, 2022

Addition of more Scenery


 When my second package of scenery arrived from, "Modeller's Warehouse", I then had to find some time to place it on the layout. When I looked at it, on it's arrival, I thought it was more than I actually needed, but now that I have placed it all, I think I could do with more. It really fills the layout and removes the so called bare spots, which were just grass.



There are 3 types of trees shown above I have selected.

Grass Tuffs, I have about 200 to use up. 

I started placing the Grass Tuffs, and found it easier than I first thought. It was a matter of peeling off the Tuffs from the backing sheet, with the fingers, as many as you like, add some glue and place them on the layout. To cover a larger area, I just peeled off some more and add them to what's there. I think I will use up my 2 packs in no time. 

Cheers for now.




Thursday, June 2, 2022

Maybe they were "Wrong Roaded".

In my last blog I mentioned about some new rolling stock. Well my wife not only has the flu, but has another virus with it. So the only solution was to have them mailed to me. The parcel arrived yesterday and I spent some time today setting them up.


C38 Class, 3827 on the Up Southern Highlands Express was running 
short on water and is in Campbelltown for a top up.

So why is the Southern Highlands topping up at Campbelltown, maybe it's because Moss Vale and Picton don't exist on this layout.

Secondly there is a C60 Class 6028 Garratt in the pictures below on an Up Coal Train and has stopped at Campbelltown to pick up some coal wagons being brought from Narellan, to go to Sydney.




Garratt waits arrival from Narellan.

Both these locos are from Eureka, with sound, and the Garratt is factory weathered. They were so well packed and on inspection they have never been out of their boxes. This was a one in a million opportunity, so I took it. The layout looks pretty full now and won't take any more as there no storage space left. 
Also today a parcel arrived from "Modeller's Warehouse" with scenery, and that's all I can do now. Still looking for my shunters.
So cheers until then.

Tuesday, May 24, 2022

Finally got there.

 This last couple of weeks I have finally finished the Diesel Storage Tower. Not having a steady hand didn't help, as there were a few small pieces involved, but I managed it ok in the end. Having small pieces meant that I had to glue one item and let it dry over night with some support before gluing the next piece. This went on for a week or more.


Diesel Tank Tower and filler pipe.

I have purchased some additional rolling stock for Camden, but it might be a few weeks before I can make the trek to Sydney to pick them up. Both the wife and I have been tested free of Covid, but my wife has a very bad dose of the flu, so will stay isolated until she over comes it.
Hopefully in my next blog I can show the additional rolling stock, but it won't blow you away.
Cheers for now.

Sunday, May 8, 2022

It pays to advertise

 A few days after I posted my previous blog, I received two emails, one with a plan, and the other with a photo supporting the plan. (This plan and photo was, received with thanks), It shows the actual layout and piping for the fuel tank and the two refueling roads which was for the 620 Class Diesel Cars. The tank and stand apparently was from Cootamundra. The piping was of 2" diameter and had non return valves in the pipes and apparently no valve cocks. That's if I read the plan correctly, which means I don't have to go searching for valve cocks to put in the pipes.



So what was my next move, remove it and start again, naturally. This meant moving the Loco office and meal room out of the way. because that's where the piping goes. It looks pretty rough there at the moment, but I am waiting for glues to set (Epoxy) and then I can straighten it up and paint it. Thought I had better post this before I get more emails.

Cheers for now


Sunday, May 1, 2022

Locked in for the day

What a better time to complete a project, seeing that I have been sleeping on it for some time now. Today we have an "Ironman Event" on here from Port Macquarie to the Camden Haven, so our only road out of here is closed to traffic.

I only have one picture showing this fuel tank, so I have done what I thought it would have been like, and my space between the tracks was another thing which restricted me in it's size. In the picture there appears to have been a "Fuel Bowser" at the bottom of the tower for refueling the Diesel Locos, and seeing I had one in my leftover box, I decided to use it. Detail in the photo is not clear at all, and some is out of view. Just adds a bit of detail to a bare module.



What I have left is, if I need to add some detail to the fuel pipes, and then paint  it before sealing it into position. 

That's the advantage of doing abandoned Branch Lines, not too many can say whether it's right or wrong, especially when they didn't know the line, and if it's not on a blog, that's better still. 

You will notice there are no trains on the layout. I have packed them away so that they don't collect dust, because I haven't run them for some time.

Early in the week I was asked if I would replace the couplings on two locos for a friend. My wife was waiting to go shopping and I said this would only take ten minutes, and we could drop them off on the way. Ten minutes turned into an hour, my hands just got the shakes, and I couldn't hold the Kdee's together when I tried refitting them to the locos, but I did it. "So much for getting old".

Cheers for now.

Thursday, March 17, 2022

Another Project can RIP

Over the few wet weeks I decided to try and build the diesel fuel storage tank for Campbelltown Loco. Things didn't work out as I had anticipated. The stand which was going to be styrene ended up in brass wire. The tank is a water tank laid on it's side. Then I tried to do the hand rail around the platform, and this is where the frustration started. So I walked away from it all and what you see is where I'm up to.


Proposed Diesel storage tank

Another thought I had was to come off the Camden Branch Line just out of Campbelltown, rise up against the wall and run along the wall above the Camden Modules with Manangle above Narellan and on to Picton which would be above Camden. This would have allowed for the CPH and another small Branch Line train (possibly a 19 Class and a HCX or freight) to break the monotony. But again calculations squashed that idea, as the grade up to the Main Southern Line would be too steep. So at the moment I will just sleep on it.

Sunday, February 6, 2022

Campbelltown Coal Stage.

Not something you would sing and dance on. Again, nothing available to say whether it was or it wasn't like it is. Just sayings, that it was there at some time.

I have in mind, that this layout appears best done with no particular time frame in mind, but to what information is available. For Instance, Campbelltown Yard, I have several track plans spaced over quite a few years, so I decided to use one that suited my operation the best. Even now as I get older, this layout is becoming complicated, but I seem to manage it ok. (Yet to try the X200 with the CCA car).



My Impression showing a bit of age

I have built the stage to represent the nearing of the end of steam. With the turntable gone and the line cut short. The steam loco can have a coal topup using the coal loading bank at the other end of the yard.
I'm still looking for figurines for shunters, any suggestions please !!

Tuesday, January 25, 2022

Another time waister, my Yass Layout

This is a slide presentation of my Yass Layout which was the first layout I built after moving from Sydney to the Mid North Coast. I had to forego finishing Yass as back problems prevented me from getting access to the rear of the layout. The turn around off Dutton Street to come back into Yass Town Yard, (which was in the centre of the room), was on open frame, so to fill the scenery I made it Twin (2 off) Ponds. The layout was operated by 4 controllers, Down Main, Up Main, Branch Line and Yard. They were all interchangable, so there was no stopping a train to go from one line to another. They were panel operated, or plug in for individual walk around, which was handy for the Branch Line.
This is a 19 minute presentation showing how far I got with the build.


I hope you enjoy this slide show/video of Yass.



 

Sunday, January 23, 2022

Something to pass the time.

Recently, I came across an old video I made in my younger years regarding doing  scenery with foam. It has been on youtube for a long time but I could never find it. Now I have found it, it maybe of some help for modellers who want mountainous or deep cuttings in their scenery.

This video was made some 15 years ago, when I was building my Kamilaroi layout.

Hope you find it useful.

Cheers.

Sunday, December 19, 2021

A chilly place to work

This week I finally finished Dairy Farmers and Loco Office. Now the freezer plant may not be exact, but it will stop the milk from "going off". It is similar to the one for the freezing plant at Boggabri, and it was a simliar size building. So, if it worked there, it should work for Dairy Farmers. I can only assume what was in place there, and a paling fence would be an obvious choice around the back. I may find some scenery somewhere to add around this area, but it will take time.



Dairy Farmers Milk Depot


Loco Office

One other thing I discovered I need at Campbelltown, is a coal stage. My thoughts on this, is to make it from timber, in a bad state of repair. This could be as a half there and half rotted away. It would be aged towards the end of the steam era. It would also be a manual loading type. An interesting structure to try and build !! 

This will be my last blog for 2021, as I'm off for a time away, so please have a happy Christmas and hope 2022 is a much kinder year to you all.

Cheers.

Wednesday, December 8, 2021

Back to Campbelltown

 It has been a few weeks now since I completed a brief description of my Camden Layout. In these few weeks I can say I have not been sitting on my backside, "although I have", because I have constructed both the Dairy Farmer's building and the Loco Foreman's Office / Employee's meal room, for Campbelltown.



Loco Forman's Office and Employee's meal room.


Dairy Farmers Factory.

I have done numerious searches for photos of either of these buildings, and all I have found is one of Dairy Farmers. I have made the cooling tower for this factory and again all I have is the picture of a cooling unit for a Freezer works I built for "Kamilaroy". Well so be it. If you have something more, please let me know, so  that I can make the change. I'm sure Dairy Farmers will operate with what has.  All I have to do now, is scenic around the buildings and employ some shunters. 

Thursday, November 25, 2021

Camden Arrival

 This is episode nine and we finally arrive at Camden. "The end of the Line". It has been a slow haul, but I hope it has been well explained. Camden Rail Line had many different motive power units during it's life time. 

When the train left the Nepean River, it travelled along the side of Aygle Street, with a slight incline past Dairy Farmers, crossed Edward Street, then curved right into Camden Station. In Camden Yard there was a loading bank for the loading of coal into 'S' & 'K' trucks, before the construction of the Narellan Coal Loader which was able to load Bogie wagons. This loading bank was opposite the station. The Goods Shed was for my memory, a one of it's kind, because it had an awning over the rail line so that wagons could be unloaded when the weather was wet. I suppose it was an "Open Air" instead of a enclosed drive through.


Dairy Farmers Milk

Camden Module

Goods Shed

Loading Bank and Camden Station


Yard Crane
The tracks in front of the loading bank are for the heavy freight and coal.

Camden was a fair size town, coming up Aygle Street from the bridge there was a street stall, two service stations, one being demolished, the other became a tyre retailer, also Clintons Holden Dealership. 

Roadside stall and Caltex Service Station


Servo which became a tyre retailer

Clintons Holden Dealership

Although at the time of writing this blog I am in the process of building some more structures for Campbelltown. I have just come across a sample of what they may have looked like, so I will go back in the future and cover what I have skipped.

Cheers and thanks for your support and interest in my blog.


Thursday, November 18, 2021

Nepean River Crossing

 Leaving Elderslie the train negotiates a large sweeping right hand curve to cross the Nepean River. This river starts in the Southern Highlands passes through Menangle, Camden, Penrith and ends up at Yarramundi, where it becomes the Hawkesbury River all the way to the Ocean at Palm Beach. I have seen a movie taken using a drone. The drone was flown from the bridge, up stream for about a Kilometer then back to the Bridge, then down stream to a weir and back to the Bridge. This gave me a birds eye view of what the area may have been like along both sides of the river banks.










Nepean Bridge after a flood in the 1960's
Photo obtained from the Internet.
Photographer unknown.

There is not much I can say about this section, other than the pylons supporting the railway line, have now been used to widen the roadway across the bridge. If I think of something I can always add it in later.

One thing I must add before I start getting questions about it's progress, is that the "N" gauge layout has been sold.